Horseback Stadium
The project’s idea started in 1995 and designing works was given to Arab Contractors (Uthman A. Uthman and co.); the engineering consultancy general department and the project execution was given to Arab Contractors Nasr city branch accordingly they started in 1995.
According to the international and Egyptian federations’ standards, Horseback Riding Stadium consists of 15942 square meter flat land six meter high Judge tower connected to an electronic screen to monitor results.73× 138 square meter competitions field. Two 25×60 square meter warming up fields
One hundred and fifty Seat round conference room to conduct seminars and press conferences .V.I.P hall, Cafeteria and Jockeys changing rooms with bathrooms and toilets attached to them.
Stables Building three Individual Building It can hold 150 horses ( in each building),It has 20 × 60 meter managing field , Horse veterinary clinic, Mess hall
Horseback Stadium IMAGES
Horseback Stadium VIDEOS